PROJECT SHOWCASE

Bunbury Outer Ring Road

Engaged by SWGA (South West Gateway Alliance) in the role of 'Survey Manager' of the $1.45B road construction project. 

Some duties of role as per below:

- Liase with and support digital engineering manager, construction team and design team

- Organise work schedules

- Provide mentoring, relief and support for surveyors and engineers

- Create and maintain all digital data for earthworks, pavements, structures, noise and retaining walls, drainage, services, temporary works for survey parties and machine control (340+design revisions). Machine and survey digital data creation for all brands.

- Report and compiling of design quantities/quantities completed throughout various phases of the project including tendering phases (Alliance model contract requiring multiple reiterations)

- Process all as-builts/QA reporting

- Document control of drawings

- Overall high manager responsibility

 

 

 

 

 

3D design model of a Bunbury Outer Ring Road interchange for machine control

Grain Bulk Storage Facilities for CBH

Our surveyors serviced the construction works of CBH bulk storage facilities across many locations including: Wagin, Lake Grace, Dumbleyung, Pingrup, Gairdner, West River, Broomehill, Newdegate, Dowerin and Darkan.


Waterbody One Bulk Earthworks, Worsley Alumina

Engaged by B&J Catalano to manage all survey tasks and final QA deliverables of bulk earthworks, dam lining and various works project. 


Greenbushes Tailings Retreatment Project

Engaged by B&J Catalano to manage all survey tasks and final QA deliverables of bulk earthworks project. 

Including design verification, earthworks volumetrics, clash detection, services and drainage setouts and as-builts.

 

3D earthworks design model for the Greenbushes Tailings Retreatment Project


Frances Creek Iron Ore Mine, NT

Engaged by CCMS/AXIS to cover surveying services of above ground mine site.

This includes: Liaising with technical services team and upper management to assist at all levels, control network verification, conduct timely volumetric surveys and reports, produce imagery, produce environmental management plans. etc.




MSA & Camp Access Roads Overpass of CV22, Roy Hill

Engaged by Riverhill Contracting to manage all survey tasks and final QA deliverables of bulk earthworks project. 

Including design verification/modification, earthworks volumetrics, monitoring, setouts and as-builts.

 

3D design model of the CV22 overpass earthworks at Roy Hill


DN450 Sewer Pressure Main, Centurion Way Transfer Main, Busselton

Oversee survey works for 1.6km of sewer pressure main works constructed for the most part with directional drilling.